TIL / UPSTREAM
Temporary construction facilities: Tilenga Upstream, Buliisa
- Client
- McDermott Ltd
- Location
- Buliisa District, Uganda
- Role
- Design & supervision
- Scope
- Design + supervision · temporary works
- Period
- Oct 2022–Dec 2024
- Value
- USD 250,000

02°10'00"N · 31°22'00"E · ALT 620M




Photography · representative site record aligned to company profile register
Design and construction supervision of temporary facilities forming the first phase of the Tilenga Oil & Gas Project upstream works (warehouses, offices, laydown yards and concrete batching plants) with detailed architectural, structural and electro-mechanical design and Defects Liability Period monitoring.
The mandate is delivered to a published standard. Uganda's regulatory frame (UNRA, MoWT, PPDA, ERB) anchors the deliverables. Field crews operate from the Kampala office with a rotating site presence.
The drawing set is treated as a contract document. Civil 3D corridor models are exported with a contractor coordination viewer; structural calculations are issued with referenced Eurocode clauses; supervision reports follow a fortnightly cadence with photographic evidence and weather-day logging.
02°10'00"N · 31°22'00"E · ALT 620M
Map · Leaflet integration pending, mono coords shown.

02°11'00"N · 31°47'00"E · ALT 700M
VIC / 5 SITES
Supervising five Visitor Information Centres across Uganda's national parks
- Client
- Uganda Wildlife Authority (UWA)
- Role
- Project Manager · Supervision
- Scope
- Construction supervision · 5 sites
- Period
- 2023–2024
- Location
- Five national parks, Uganda
ACP / 5.0 KM
Internal road network at the Africa Coffee Park, Ntungamo
- Client
- Inspire Africa Coffee Ltd
- Role
- Supervising Engineer
- Scope
- Road works supervision · 5.0 km
- Period
- Feb–Aug 2025
- Location
- Ntungamo District, Uganda

00°53'00"S · 30°15'00"E · ALT 1640M