Long-form notes from the
drawing office.
7 notes
02 Mar 2026 · 1 min read
Thirty-four kilometres of DINU roads: what supervision looks like at district scaleReadOn the EU-funded Moyo rehabilitation, the engineering challenge was not a single alignment, it was holding three separate contracts to one drainage and quality standard across 34.36 km.
10 Feb 2026 · 1 min read
ISO 19650 from survey to handover: how the drawing office stays one systemReadCivil 3D, Revit, Tekla and QGIS only earn their keep when information is organised under one ISO 19650 naming and issue discipline, not when each tool lives in its own folder.
20 Jan 2026 · 1 min read
Earthworks discipline at Mwerasandu: moving ground without losing the levelsReadBulk earthworks on the Mwerasandu tin-mine platform were never about volume alone. The mandate was to cut and fill at pace while holding survey control tight enough for the structures that follow.
08 Dec 2025 · 1 min read
Designing dairy facilities that a cold chain can actually runReadFor the Dairy Development Authority, a milk-collection centre is a process building before it is a structure. The design has to serve the cold chain, the wash-down and the flow of people and product.
15 Nov 2025 · 1 min read
Reading the land first: ESIA before the Nkwanzi eco-resortReadAn eco-farm resort only earns the name if the environmental study leads the design, not the other way round. At Nkwanzi, the ESIA set the footprint before a single villa was drawn.
05 Oct 2025 · 1 min read
Fit-out at height: holding tolerances across an occupied apartment blockReadInterior fit-out on the Kololo and Rivonia apartments is a coordination job as much as a finishing one, services, joinery and tolerances all converging in rooms other trades still need.






