Long-form notes from the
drawing office.
4 notes matched
18 Apr 2026 · 1 min read
Supervising five national-park visitor centres at once: what coordination really costsReadAcross Murchison Falls, Semliki, Rwenzori, Kibale and Bwindi, the hard part of the IFPA-CD Visitor Information Centres was never the buildings. It was the simultaneity.
02 Mar 2026 · 1 min read
Thirty-four kilometres of DINU roads: what supervision looks like at district scaleReadOn the EU-funded Moyo rehabilitation, the engineering challenge was not a single alignment, it was holding three separate contracts to one drainage and quality standard across 34.36 km.
20 Jan 2026 · 1 min read
Earthworks discipline at Mwerasandu: moving ground without losing the levelsReadBulk earthworks on the Mwerasandu tin-mine platform were never about volume alone. The mandate was to cut and fill at pace while holding survey control tight enough for the structures that follow.
05 Oct 2025 · 1 min read
Fit-out at height: holding tolerances across an occupied apartment blockReadInterior fit-out on the Kololo and Rivonia apartments is a coordination job as much as a finishing one, services, joinery and tolerances all converging in rooms other trades still need.



